ROOTS FINISHED BASEMENTS 435.677.6050
Roots— Finished Basements —

Included in most Roots basements

Adding a bathroom to your basement

A basement without a bathroom is a basement nobody wants to sleep in. We add a full bath over the plumbing stubs your builder left, with tile, a vanity and fixtures that match the ones upstairs.

7 to 8 week finish, in your contractEvery line pricedFinishes matched to upstairsLicence 14282096-5501

Most new build basements have the stubs for a bathroom already in the slab. We plan the bath over them, rough in the supply and drain, build the shower or set the tub, tile it, and set the vanity and toilet at the end. The bathroom is its own line on the proposal, so you see exactly what it costs.

What is included

  • Shower with tile surround and glass, or a tub
  • Vanity, mirror and lighting matched to the main floor
  • Toilet, fixtures and hardware to match upstairs
  • Tile or vinyl plank floor
  • Exhaust fan vented outside
  • Plumbing and electrical inspected

How Roots does it

Finished basement bathroom with tile shower and black fixtures
01

Tile, glass, matched fixtures

A real Roots basement bathroom in Utah County. The fixtures match the main floor.

Basement bathroom with vanity, tub and wall-mounted TV
02

Built the way you will use it

Tub for the kids, a TV on the wall, storage in the vanity. It is your plan.

What it costs

A full basement bathroom over existing stubs is a single itemized line on most proposals, and finish level moves it most: a tile shower with glass costs more than a fiberglass surround. We show both numbers if you want to compare.

Other services on the same contract

Questions about basement bathroom addition

Can I add a bathroom if there are no stubs?

Yes. The slab is cut for the drain, which adds a line to the proposal. We tell you the number on the first visit.

Can the basement bathroom match the master bath upstairs?

Yes. Tile, vanity style, fixtures and hardware can all be matched or chosen to complement.

How long does the bathroom add to the schedule?

Nothing. It is built inside the same 7 to 8 week schedule as the rest of the basement.

Book a walkthrough. One visit, then a line item price and a finish date in writing. You decide after you have both.

Call 435.677.6050