— Finished Basements —Weeks three to five
Basement drywall, tape, texture and paint
Drywall is where the basement starts to look like a house. We hang it, tape it, match the texture to upstairs and paint it, in sequence, by the same crew that does every Roots basement.
After the framing and rough-in inspections pass, the drywall goes up. Taping and mudding take a few days, texture is matched to the main floor so the two never look like different houses, and paint goes on before the flooring so there is nothing to protect. Three stages of the week by week build on our comparison page.
What is included
- Drywall hung on walls and ceilings, screwed to schedule
- Corners and joints taped and mudded
- Texture matched to the main floor
- Primer and two coats of paint in the colors upstairs
- Ceiling painted, not left primer white
- Clean before flooring goes in
How Roots does it

Hung in week three
A real Roots basement in Salem with the drywall up and the ceiling closed.

Painted in week five
The same room textured and painted to match upstairs, ready for doors, trim and floors.
What it costs
Drywall is itemized by square footage on your proposal, with texture and paint as their own lines. It is one of the larger lines in most basements and one of the least likely to change.
Other services on the same contract
Questions about drywall installation and finishing
Can you match my builder's texture?
Yes. We look at the main floor on the first visit and match it. Orange peel and knockdown are the usual ones in Utah County.
Do you paint the ceiling?
Yes. Walls and ceiling, primer and two coats, in the colors you choose or the builder colors upstairs.
How long does drywall take?
Roughly weeks three through five of the 7 to 8 week schedule, including drying time.
Book a walkthrough. One visit, then a line item price and a finish date in writing. You decide after you have both.
Call 435.677.6050